Makeup air units (MAU) replacements — Quick facts
-
Status: Ongoing
-
Location: Building A-west, Abbotsford Campus
-
Project size:
-
Expected completion date: 2024
Project overview
The project aims to replace the two existing gas-fired MUA units with two new hybrid VRF heat pump MUA units with natural gas backup to reduce natural gas consumption and GHG emissions.
Project features
- Decommission and remove two existing MUA units
- Install and commission two new MUA units
- Install controls for new mechanical equipment.