Skip to main content

Sustainable UFV

Makeup air units (MAU) replacements

Makeup air units (MAU) replacements — Quick facts

  • Status: Ongoing
  • Location: Building A-west, Abbotsford Campus
  • Project size:
  • Expected completion date: 2024

Project overview

The project aims to replace the two existing gas-fired MUA units with two new hybrid VRF heat pump MUA units with natural gas backup to reduce natural gas consumption and GHG emissions.

Project features

  • Decommission and remove two existing MUA units
  • Install and commission two new MUA units
  • Install controls for new mechanical equipment.

Related SDGs:

Clean energy, Climate action